‎2006 Jul 10 1:45 PM
I set up an output type based on a requirement(for change ).
I am unable to grasp the concept :
WHen i get into the Tcode , without doing any changes I goto messages , I see no message is determined . I go back and do some changes ( i dont even save them ) and now go and see the messages , as per the message schema and requirement ( I see that the code for req actually check the NAST table ) ...When i dint even save the changes , how can the NAST entry be written and checked in the Req Source Code.?
How does this actually work ?
‎2006 Jul 10 1:49 PM
Hello,
When an output type is added to a document, when u press enter the system will ask for the Ouput Devise. Once u give the output device. An entry will be made for that document.
If useful reward points.
Rgeards,
Vasanth
‎2006 Jul 10 1:56 PM
I am not sure about this automatic message determination .,the system doesnt asks me anything ..based on the setting it fetches the output types for the document .
I want to know , when is the NAST entry actually writte? when is the Condition record actually created ?