‎2007 Aug 14 1:39 PM
‎2007 Aug 14 1:46 PM
please assign the points to u r previous threads for all helpful answers
‎2007 Aug 14 9:25 PM
Create a variant for the reports selection screen
Use Execute in Background option in SE38
Schedule the report with the variant either immediately or later.
-Kriss
‎2007 Aug 14 9:49 PM
Hi Mayuri,
The main pre-requisite for a background processing is that a program has to be there either with or without a variant along with the authorization to run the program.
Hope this helps.
Please reward if useful.
Thanks,
Srinivasa