Please explain me abt the product planning table & the Tcode.

3 REPLIES 3
Read only

Former Member
0 Likes
547

Hi

<b>Demand Planning (DP)</b>

The Demand Planning component is a toolkit of statistical and collaborative forecasting techniques that helps you create accurate forecasts and plans

The result of APO Demand Planning is the demand plan.

<b>Supply Network Planning (SNP)</b>

Is used to calculate quantities to be delivered to a location in order to match customer demand and maintain the desired service level .

APO Supply Network Planning integrates purchasing, manufacturing, distribution, and transportation so that comprehensive tactical planning and sourcing decisions can be simulated and implemented on the basis of a single, global consistent model .

Supply Network Planning determines a permissible short- to medium-term plan for fulfilling the estimated sales volumes. This plan covers both the quantities that must be transported between two locations (for example, distribution center to customer or production plant to distribution center), and the quantities to be produced and procured. When making a recommendation, Supply Network Planning compares all logistical activities to the available capacity.

<b>Production Planning / Detailed Scheduling (PP/DS)</b>

We use Production Planning and Detailed Scheduling (PP/DS)

To create procurement proposals for in-house production or external procurement to cover product requirements

To optimize and plan, in detail, the resource schedule and the order dates

With PP/DS you can create executable production plans and

Reduce lead times

Increase on-time delivery performance

Increase the throughput of products and reduce the stock costs, through better coordination of resources, production and procurement

<b>

Transportation Planning / Vehicle Scheduling (TP/VS)</b>

This component helps you to select the optimum transportation route and schedules vehicle resources.

Transportation Planning enables the transportation planner to make optimum use of the available capacity of freight vehicles, trains, ships, and airplanes. In this way, loading capacities can be planned more efficiently and costs are lowered, especially since most customers depend completely on external transportation companies for optimum transportation. In short, Transportation Planning results in deliveries that are on time and at minimum cost.

The TP/VS component contains the following functions:

Transportation planning and transportation consolidation

Vehicle scheduling and route determination in a dynamic environment

Transportation mode and selection of transportation service provider

Multi-pick and multi-drop functions

Tcodes

<b>In R/3</b>

1 Check ALE Settings SALE

2 Setting the RFC Destination SM59

3 Setting the Target System CFC1

4 Maintaining APO Release NDV2

<b>In APO</b>

1 Maintain Business System Group /SAPAPO/C1

2 Assign Logical System /SAPAPO/C2 3 Create Customer Enhancement CMOD

<b>Transaction Codes in Integration Model</b>

Create Integration Model CFM1

Report:- RIMODGEN

Manually Activate Integration Model CFM2

Report:- RIMODACT

Activate Integration Model (Bkgd ) CFM3

Report:- RIMODAC2

Display Integration Model CFM4

Report:- RIMODOUT

Integration Model Object Search CFM5

Report:- RIMODSRH

Modify Integration Model CFM6

Report:- RIMODMOD

Delete Integration Model CFM7

Report:- RIMODDEL

Rgds,

Prakash

Read only

Former Member
0 Likes
547

For product planning table T code is /sapapo/ppt1