Application Development and Automation Discussions
Join the discussions or start your own on all things application development, including tools and APIs, programming models, and keeping your skills sharp.
cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

ALE query

Former Member
0 Likes
562

hi ,

Can anybody explain me the sep-by-step process for getting the material master using BD11- PULL approach. I had already configured the Distribution model for sending the request MASFET in system B, from which we are requesting the material master through BD11. Also we had maintained another Distribution Model in System A, from which the MATNAS will have to pulled to the System B.My issue is MATFET Outbound IDOC is created in syatem B and System A has an Inbound IDOC of MASFET. But after the IDOC get posted in System A , the MATMAS Outbound IDOC is not getting created in System A automatically.Is there any program we need to run for trigering the MATMAS outbound IDOC in System A????

1 ACCEPTED SOLUTION
Read only

Former Member
0 Likes
513

hi Natalie ,

I refer you to go through the wiki link as given below

this Link contains alot about ALE connections

https://wiki.sdn.sap.com/wiki/display/ABAP/ALE+Introduction

or you you may refer the thread of the ALE

Regards

Aditi Wason

3 REPLIES 3
Read only

Former Member
0 Likes
514

hi Natalie ,

I refer you to go through the wiki link as given below

this Link contains alot about ALE connections

https://wiki.sdn.sap.com/wiki/display/ABAP/ALE+Introduction

or you you may refer the thread of the ALE

Regards

Aditi Wason

Read only

Former Member
0 Likes
513

in system A , in inbound parameters give ALEREQ01 in messagetype options.

and select corresponding process code.

Edited by: 00541a0429 on Jul 15, 2009 11:04 AM

Read only

Former Member
0 Likes
513

Hi Natalie ,

your can refer to the below link as reference inorder to solve your problem

[original link is broken]

regards

Saurabh Goel