Hello SAP Gurus,
When I reverse confirmation at iw45 transaction code for pm orders, it only reverses activity consumptions but it doesnt reverse the material consumption that I confirmed for pm order. I get this warning message below;
Message BK244 - Not possible to reverse actual costs
Diagnosis
You have reversed the / confirmation. Actual costs are to be posted for
this reversal, but there is no cost accounting document for this
reversed confirmation.
System Response
No actual costs are posted for the confirmation reversal.
How could I fix this?
Thanks a lot already
sadullah
Request clarification before answering.
Hi
I just could manage to reverse it by using MB11.
Thanks for all
sadullah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can try MB1a through Mov type 262 to reverse the material issued in PM order
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please refer to the recommendations from http://service.sap.com/sap/support/notes/155282
Hope it Helps!
Thanks and Regards,
Varshal Kachole
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Varshal,
As far as i can see, this oss notes and the other ones that are mentioned it are mostly about activity confirmation whereas my problem is I cant reverse the material confirmation. There is no record in COFC which is sensible since I reversed activity confirmations.
But even though I run iw45 transaction code, i still see material costs at pm order. How could I reverse material confirmations too?
Thanks a lot
| User | Count |
|---|---|
| 22 | |
| 20 | |
| 5 | |
| 5 | |
| 4 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.