MAGESHWARAN_SIVASAMY
Explorer
Member since ‎2023 Nov 29

User Statistics

  • 3 Posts
  • 0 Solutions
  • 2 Kudos given
  • 0 Kudos received

User Activity

Dear Experts,We have the below requirement.1) Receive goods into an IM location and perform inspection.2) After inspection, the goods are transferred to EWM.3) "01" inspection is active and inspection is method chosen in EWM is based on material mast...
Is it not possible to perform inspection for incoming goods using RFUI in embedded EWM ?The requirement is to scan an inspection slip printed during GR and perform inspection using RF. 
Kudos given to