i am trying to configure Subcontracting process with challan in ECC offline system to understand Challan concept. Anyone did before. if yes, please share the document. i am facing so many issue during Challan creation through tcode-J1if01.
i have done all SD configuration, shipping tab also coming in PO, and maintained tax code in material Master still Outbound Delivery is not generating in VL10B..and their is nothing in Log
I execute MB51 report …in some of material Doc, amount in local currency comes Zero.why it is zero?Ans…Amount in local is system calculated field, during GR.you can see this field in quantity tab of MIGO.See this 2 Material Doc,in 5024699761- Amout i...
I faced the same problem, but I found a solution. If all configurations are correct (such as class, classification, group, and release level checkmark), and yet the release tab is not appearing at the header level, then simply click on the check butt...