Hi All,
I would like to use the code CHHU + CHBD in parallel. Because, I would like to change my destination HU and my destination bin.
But I have only one field for one code.
How can I use several exception codes in Desktop - Transaction or ...
Hi everyone,
I have a question. I would like to proceed following steps in my goods receipt process:
1. IB02 (Decon)
2. IB03 (Putawy)
I did following:
I packed a pallet in my Inbound delivery with two products. One product should go to s...
Hi Everyone,
we would like to use Stock Room Management and we would like to run WM on compatibility modus. Therefore I have two questions:
1. We are running a WM on ECC. Now with S4 we would like to implement a Stock Room. Do we have standard ...
Hi everybody,
I am dealing with this topic "Batch Determination in embedded EWM". I maintained my system and I have the search criteria in SAP EWM, but I have following questions:
1. How can I change/update the search criteria in my outbound del...
Hi All,
I am using the transaction COPAWA for assign my free HU to my production order. But now I have a second production order and I would like to assign my HU as well. I have tried it before I posted the GI and after. I get everytime the same er...
I found the right setting. Source and destination have the same storage location. Both have AFS storage location, althouhg I am using the availability group 003 for my storage location "Production". with the stock determination, it is working fine.
shailesh.mishra5 Thanks for your Blog. Great. One question: the most used process is the provistion of the production. But how can I assign my provided stock to my PSA to my PMR? I am using PMR order specific staging. Thanks! RegardsDaniel
Hi Oliver,could you tell me which storage location has the CC and PSA? ROD or PSA? Is the stock determination for the consumption posting or for the picking? Thanks!
I tested a process where I have only one position in my HU. The HU should not relevant for Decon I guess; And yet he wants to go into the step IB02. How can I skip IB02? But I think my putaway strategy is right.
Hi Juergen, Hi Daniil,thanks for you reply. Now I have changed my POSC settings, I am only using IB02 and IB032021-04-13-08-26-08-process-steps.png2021-04-13-08-26-41-destination-bin.pngAnd I changed my work center to "Allowing repack with active LB"...