Dear All,We have a Make to Order Scenario for Projects. The Finished Goods are with Individual Requirements (MRP4), Strategy Group blank (MRP3).The planned Orders are created using the MRP and then converted into Production Orders. (WBS is assigned)W...
Hi All,I wanted the Withdrawls quantity in the display in the IW32 screen in Components tab.I used the table control and saved with new variant and made that defaiult. In the Standard setting this fiedl was invisible.But this never shows up and when ...
Dear All,We have configured a Period Scaling using the Rental Contracts process. That is scaling based on period.Also we could individually acheive Group Scaling.But we need both the conditions in the same, and system gives error saying only one of t...
Dear All,We have carried out a Pricing procedure where intially cost Condtions are enetred and then the Profit Margin.Presently the system works as : If Cost is Rs.80, 20% Profit, Total Value is Rs.96But the requirement is If Cost is Rs.80, 20% Profi...
Dear All,I had configured the DIP profile to pick the External Services cost into the Quotation. The Material is getting determined but the costs are not trasnferred to the Quotation.Will the EK01 condition type enough to capture the planned costs? F...