The future will be shaped by those who effectively integrate design and supply chains. Seamless Integration and collaboration are not just choices but the cornerstones of success in the evolving landscape.Introduction:While writing this blog, I am in...
Introduction:
While writing this blog, I am working as a Senior Architect in the SAP R&D North America services department. The views expressed are per my experience working with customers in various industry types.
There is a considerable amount o...
Hi GurusRequirement is to remove already assigned characteristic value for multiple DIRs (3000+). I tried via CLMM (set and change values) but got error message " Object PDD E-91525-001 17 001 does not exist", Where: PDD=doc type, E-91525-001 = DIR ...
Hi GurusDoes Engineering record supports alternate validity date concept? If so can anyone guide me where it situated & activation stepsIf the answer is NO then how does ER can be used to support multiple objects (DIRs, MatBoms etc) to be released at...
Hi GurusHave anyone used or integrated ER with ECTR (DSCs)? I am trying to search capabilities DSC ECTR offers for engineering record.At minimum below:-Does search Queries within ECTR can be enabled for ERs?-Can the basic data screen or Attributes of...
A change (ECN or MCN) created in a third-party PLM system (Like Siemens Teamcenter) can be transferred using SAP out-of-the-box PLM system integration (aka PLMSI). Below is some detail with possible steps:Step 1: Follow the regular ECN/MCN process in...
The short answer is No. You cannot use one or the other. Below is the explanationSAP PEO is Product Engineering (PE) and Product Operations (PO) & deals with “Version controlled” master data (this is different data-model than classic SAP) like Versio...
Hi AllI wanted to leave a feedback to this thread after some research and inputs from folks here (Ulf & Abhishek).ER does NOT support alternative validity dates by itself. This feature is mainly used for logistic scheduling, if you are not trying to ...