Hi all.
In a PS scenario with assigned production orders we get planned cost from the production orders appended to the project after checking the box for that in OPSV and executing a network costing.
It seems the account used for the planned cos...
Hello all.
This question refers to a use-case in which top-down scheduling is used.
We have two WBS elements (A and B) with their own networks with a network activity (1 and 2) assigned to the respective WBS element. A&1 and B&2.
A start-star...
Hello.
One of the things clarified in note 520000 (FAQ_Valuated special stock) is how how goods receipts to valuated project stock from production orders are valuated.
The note explains that for materials with price control S (standard price) th...
Hello.
The documentation under MRP Element Maintenance explains that the system after a material requirement date change corrects reservations automatically and that planned orders are corrected during the next MRP run.
If a purchase order has a...
Hi.
I noticed the below quote in the SAP help
"From the accounting point of view, working with valuated project stock offers the following advantages over working with non-valuated project stock:
….
You can use project resource-related billi...
Following up on the above. I looked at this together with an ABAP:er but we could not see a way of updating the account used for the planned costs via the strategy U option.
Hi.Thanks for feedback. I will try to elaborate further below. As I wrote we have a PS scenario with assigned production orders. As we have the append flag set in OPSV for order type 10 we get the planned cost of the assigned production orders app...
Hi Ken.Thanks for feed-back. I did not get the comment about the network activities though.Maybe a side-step from the question at hand but good to verify the scheduling approach. I will try to elaborate a bit more in what follows.Below is the top-...
Hello all.It is also of interest how to best provide planned cost for a material manufactured only once which I assume may connect back to the question asked about " engineer-to-order costing of the WBS element ...".One option is to append the planni...
Hi.Thanks to both Caetano and Ken for elaborating on how MRP work. If not having a check upon making the change of the requirements date I assume the best way to monitor this from a project perspective is to run the MD4C Order Report for project / WB...