Hi, we are planning to upgrade our SAP ECC6.0 on AIX 6.1 from DB2 v9.5 to DB2 v10.5Which would be the preferred option ?9.5 --> 9.7 --> 10.5 or9.5 --> 10.1 --> 10.5Since we would be upgrading within the same downtime, can we continue directly from 1s...