Hi, Stephan.
Yes, changing the values directly on SE16H is a possibility. This would however not be advised by SAP as it could lead to inconsistencies.
In your case since the material had not been used yet, the chances that an inconsistency will ...
Hello,
It is not possible to have the items sorted as you want them.
In fact the same grid values can appear under many items with the same material but this is the standard system design.
I hope this helps you.
Regards,
Guilher...
To set a BP (Break-point) you simply need to open the include you want to set the break-point for (in this case on tcode se38) and just double click on the left side of the line you want to set the break-point for.
Hello,
If you do not receive any error messages while running the mass change the best way to go about this would be to check how the update is ran by debugging the system. This would allow you to understand why some fields are not being updated...
Hello, Stephan.
Once a material is created no changes can be made to the "Season Level" of the material. This is how the system was designed.
Your consultant is correct, the best way to handle this would be by creating new mate...