Hi All Please help me in suggesting the best suitable solution. In my case , client has a Power Plant which has WHRB ( Waste Heat Recovery Boiler) boiler. Waste heat is received from an adjacent unit of Sponge Iron (DRI). In case of DRI the proce...
Hi Experts The system should give an error or restrict further flow during product confirmation in C011N if the costing run has not been done, right? Please correct me if the above assumption is wrong. So, in my current scenario system does not r...
Dear All The Fiori app F1685-Record Inspection Results is not working for me for 03 type inspection lot.In ECC same is working for 03 type inspection lots with inspection point, but same is not working for the above FIORI app. When I put the insp...
Hello, Experts.In my current scenario, the process is as below.Business confirms the same material and same batch under multiple production orders.04 Inspection type is activated for this material and the field Post to Insp. The stock is unticked (Ma...
HiWe have assigned 04 type Inspection for a material with the fields Insp with Task List , Automatic Assignment, and Check Chars unticked in QM view material master. Hence only usage decision is required for such inspection lots, no need to do Result...