Hi All,
We have got the operation Effect field (Production Stopped/Not impacted) in PM Notifications (QMIH-AUSWK) and other field System Condition (In Operation/Not in operation) in PM Order or Task lists (AFVC-ANLZU) / PLKO-ANLZU). I have below tw...
Hi All,I am trying to execute the IW37N transaction with only selection in operations tab i.e. 'Personnel Number for Split = Blank' and I am getting no output. Refer attached screen shot.Any idea why is this so?FYI - My requirement is to get the list...
Hi All,Gone through most of the existing posts but still could not get an answer why I am not able to load operations.I need to upload the task list header details, operation details & components. I am using standard batch input. I have created the s...
Hi All,Can you please help me with the term SAP SM i.e. SAP Service Management?1. Brief about SAP SM?2. Is it a separate module?3. Is it provided by SAP now or replaced with any other module like SAP CS?Already gone existing posts but those are very ...
Hi All,Can you please help me with the term SAP SM i.e. SAP Service Management?1. Brief about SAP SM?2. Is it a separate module?3. Is it provided by SAP now or replaced with any other module like SAP CS?Already gone existing posts but those are very ...
Hi,Technically, we can not identify the 'Scheduled to save' related maintenance plans as it is temporary status. When we schedule the maintenance plans there are two actions either save or exit without saving. Immediately after these actions, 'schedu...
Hi Mika,1. Ensure you are assigning the same hierarchy levels for all packages in strategy. (Because you are expecting all packages to be called on due date). To to see detailed dates in maintenance plan scheduling, enter the longer scheduling period...
Hi Manivannan,
Follow below steps.
1. Create a task list with set of operations.
2. Create a single cycle maintenance plan with above task list with 1 month cycle.
3. Start the maintenance plan from IP10 once by providing required start da...
Hi Manivannan,
Your question is not quite clear. However, if you wish to create PM Order automatically you need to create a maintenance plan and then it need to be scheduled on required frequency (generally daily).
For automatic scheduling of ...