Ahmedehab17
Product and Topic Expert
Product and Topic Expert
Member since ‎2015 Mar 25

User Statistics

  • 21 Posts
  • 3 Solutions
  • 2 Kudos given
  • 7 Kudos received

User Activity

Hello Experts,Maintenance Orders reserves capacity in transaction Capacity Evaluation (CM50) while IBP standard integration reads capacity time buckets from transaction Capacity Planning: Selection (CM01) which does not consider Maintenance Orders, S...
Hello, I want to know if there is a solution for this issue. Two released production orders exist. GI is performed against the first Production order via MIGO (261) the issued materials needed to be transferred to the other production order a...
Excluding Expired Batches from MRP Run There is a requirement that most of us faced specially when implementing SAP for Food & Beverage which is excluding expired batches from the MRP run calculation. I found the following solution as one of the pro...
DearsI am trying to build a super routing for a variant configuration material depending on the raw material and the configurable material characteristicsfor exampleraw material thickness 1.8Configurable material thickness 0.5then Processing time in ...
Hi Friends !I am trying to Implement Make-to-Order Cycle with variant Configuration on ECC 6.0 EPH 7.0 with activated DIMP solution.while trying to convert a Planned order created by MRP as a result of a Sales OrderThe following Error appearsThe Erro...