‎2008 May 14 10:29 AM
Hi,
Can any one please give me the details on how i can get a link from the work centre to get the characteristic values from classification. I think the characteristic values are there on AUSP, but i cnt seem to find a link between work centre header CRHD to AUSP..
Appreciate your help.
Thanks
Keshi
‎2008 May 14 10:40 AM
Hi
Hope it will help you.
Reward if help.
Work Center
Definition:Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
Machines, machine groups
Production lines
Assembly work centers
Employees, groups of employees
Use
Together with bills of material and routings, work centers belong to the most important master data in the R/3 production planning and control system. Work centers are used in task list operations and work orders. Task lists are for example routings, maintenance task lists, inspection plans and standard networks. Work orders are created for production, quality assurance, plant maintenance and for the Project System as networks.
Data in work centers is used for
Scheduling
Operating times and formulas are entered in the work center, so that the duration of an operation can be calculated.
Costing
Formulas are entered in the work center, so that the costs of an operation can be calculated. A work center is also assigned to a cost center.
Capacity planning
The available capacity and formulas for calculating capacity requirements are entered in the work center.
Simplifying operation maintenance
Various default values for operations can be entered in the work center.
Look at CR01 ,CR02,CR03 Transaction
table : CRHD Table