‎2007 Aug 24 12:33 PM
‎2007 Aug 24 12:36 PM
‎2007 Aug 24 12:42 PM
Hi,
Upgrade project means upgrade lower version to higher version. For ex: 4.6 to ECC6. In new version we will fix the syntax errors and replacing the functio modules.
Give ur mail id i wil send detial information
Regards
Srinu
‎2007 Aug 28 5:24 AM
my mail id is ncherry83@gmail.com
waiting for ur reply
regards
Giridhar
‎2007 Aug 24 12:46 PM
Hi
like this
OCLC's CIP Record Upgrade Project Specifications
The following MARC21 fields and subfields are included in record review and upgrade. They are reviewed for accuracy, corrected if inaccuracy is found, and completed if incomplete. The piece will be in hand at the time of upgrade.
________________________________________
Fixed Field Information
A. Change Fixed Field Encoding Level to indicate the status has been changed from prepublication level (8) to either full level (blank) or core level (4). Coding will be core level (4) if pcc is present in the 042 field. All other records will be changed to blank encoding level.
B. Type of Record
C. Dates 1 & 2
D. Country of Publication
E. Language Code
F. Other specific attributes based on the piece in hand (Nature of Contents, Illustrations, Index, etc.)
Tagged Fields
Note: The LCCN will not be changed under any circumstances.
1. 020 ISBN
2. 041 Language Code
3. 050 LC Call Number focusing on correct form and date
4. 1XX Main Entry
5. 245 Title and Statement of Responsibility
6. 246 Varying Form of Title: Optionally add this if applicable, depending on catalogers judgment.
7. 250 Edition
8. 260 Place of Publication, Publisher, and Date of Publication
9. 300 Physical Description, subfields a, b, c, and e
10. 4XX/8XX Series
11. 504 Bibliographical reference note: Add field if warranted; if field exists, add page numbers as appropriate
12. Check existing additional 5XX fields for accuracy. Additional notes will only be added to justify existing or newly added access points not justified in the description, to add original publication information for reprints, or to describe the language of the piece
13. Ascertain whether Subject, Name and Series Added Entries are appropriate for the work. Correct and verify against authority file where necessary. Add second and third authors in 7XX if lacking.
14. Delete the 263 where it occurs
15. For atlases: 255 Scale
16. For atlases: 034 Coded Scale
17. For books with accompanying material: 538 system requirements, if applicable and if available
18. At the catalogers discretion, other fields may be reviewed, edited or added as time permits
The following changes are automatically handled by the OCLC Cataloging Service
1. Leader byte Record status changes to a 'c' for corrected record
2. An institution symbol will be added to 040 $d to show the modifying agency
Symbols include:
BKX: BWI, Book Wholesalers, Inc.
BWKUK: Blackwells Book Service, UK
C#P: OCLC CIP Upgrade Service
IG#: Ingram
QBX: Quality Books
YDX: Yankee Book Peddler
3. The Replaced date is updated to show the date of the replace.
Notes: For a publication received in one year, which has a publication date of the next year, or lacking a publication date, a copyright date of the next year, treat the date on the item as the date of publication. For example, if a publication received in 1998 has "1999" as its publication date, use 1999 for all applicable dates (possibly 260 subfield c, Dates in Fixed Field, and date in 050) in the record.
OCLCs CIP upgrade program involves printed materials only, unless there is accompanying material in a non-print format.
When an upgraded record is received by OCLC from LC, it automatically replaces the upgraded record in the database. LCs upgrade becomes the master record within WorldCat.
reward if usefull