2007 Mar 28 5:13 PM
Hi Guru:
We plan the cos testimate outside ECC.
So, is there anyway to update the the cost estimate itemization with ABAP?
I only find a BAPI to read the cost estimate itemization BAPI_COSTESTIMATE_ITEMIZATION.
Thanks.
Eric
Hi Guru:
We plan the cos testimate outside ECC.
So, is there anyway to update the the cost estimate itemization with ABAP?
I only find a BAPI to read the cost estimate itemization BAPI_COSTESTIMATE_ITEMIZATION.
Thanks.
Eric
2007 Mar 28 9:02 PM
Can anyone help me on this?
Simply saying, I want to update the COPC cost estimate with an abap program.
Thanks.
Eric