hi,

may i know the difference between

call screen

set screen

leave screen

leave to screen.

1 ACCEPTED SOLUTION
Read only

Former Member
0 Likes
1,072

hi,

CALL SCREEN statement interrupts the current screen sequence and starts a new one. When you start a screen sequence with a transaction code, you can stack up to 50 other screen sequences on top of it. However, you should not exceed 40 sequences, since help and error dialogs also use internally-implemented screen sequences.

Every screen has a static next screen that specifies the next screen to be called after the current one, as long as it is not overwritten dynamically. In the processing logic, that is, a dialog module called by the screen, you can use the SET SCREENstatement to overwrite the statically-defined next screen dynamically:

SET SCREEN Folgedynpro.

This statement defines a new next screen for the current program run. You can also specify the number of the next screen as a field containing a screen number. The statically-defined next screen is ignored. However, this only overrides the static screen sequence temporarily. The static value for the next screen, as defined in the Screen Painter, is always retained.

The LEAVE SCREEN statement ends the current screen and calls the subsequent screen. The next screen is either the static next screen or a dynamic next screen. In the second case, you must override the static next screen using the SET SCREEN statement before the LEAVE SCREEN statement.

reward points if helpful..

7 REPLIES 7
Read only

Former Member
0 Likes
1,072

hi,

Calling Screens Internally from the Same ABAP Program

In any ABAP program that can have its own screens (type 1, M, or F), you can use the

CALL SCREEN <dynnr>.

statement to call a screen and its subsequent sequence within that program. The flow logic of each screen calls dialog modules in the program that called the screen.

When the screen sequence ends, control returns to the statement after the original CALL SCREEN statement.

Leaving a Screen Sequence

A screen sequence terminates when a screen ends and the defined next screen has the number 0.

You can leave a single screen within a sequence using the

LEAVE SCREEN.

or

LEAVE TO SCREEN <dynnr>.

statement. These statements exit the current screen and call the defined next screen. If the next screen is screen 0, the entire screen sequence concludes.

reward points if useful,

seshu.

Read only

Former Member
0 Likes
1,072

Hi,

In any ABAP program that can have its own screens (type 1, M, or F), you can use the

CALL SCREEN <dynnr>.

statement to call a screen and its subsequent sequence within that program. The flow logic of each screen calls dialog modules in the program that called the screen.

When the screen sequence ends, control returns to the statement after the original CALL SCREEN statement

- Leave screen

Exits the currently screen and leave to the last one

- leave to screen

Exits the currently screen and leave to the screen to define

Regards

Nicole

Read only

Former Member
0 Likes
1,073

hi,

CALL SCREEN statement interrupts the current screen sequence and starts a new one. When you start a screen sequence with a transaction code, you can stack up to 50 other screen sequences on top of it. However, you should not exceed 40 sequences, since help and error dialogs also use internally-implemented screen sequences.

Every screen has a static next screen that specifies the next screen to be called after the current one, as long as it is not overwritten dynamically. In the processing logic, that is, a dialog module called by the screen, you can use the SET SCREENstatement to overwrite the statically-defined next screen dynamically:

SET SCREEN Folgedynpro.

This statement defines a new next screen for the current program run. You can also specify the number of the next screen as a field containing a screen number. The statically-defined next screen is ignored. However, this only overrides the static screen sequence temporarily. The static value for the next screen, as defined in the Screen Painter, is always retained.

The LEAVE SCREEN statement ends the current screen and calls the subsequent screen. The next screen is either the static next screen or a dynamic next screen. In the second case, you must override the static next screen using the SET SCREEN statement before the LEAVE SCREEN statement.

reward points if helpful..

Read only

Former Member
0 Likes
1,072

Hi,

If you write the syntax call screen then it will interrupt the current processing and call that particular screen. After processing that screen it will goto previous screen. In set screen it won't interupt the current processing and after completion of processing it will go to that screen. In leave screen it will leave that particular screen. If you give leave screen <no> then it will go to that particular screen number. Here it won't come back.

Thanks

Sarada

Read only

Former Member
0 Likes
1,072

With SET SCREEN, the current screen simply specifies the next screen in the chain. control branches to this next screen as soon as the current screen has been processed. Return from next screen to current screen is not automatic. It does not interrupt processing of the current screen. If we want to branch to the next screen without finishing the current one, use LEAVE SCREEN.

With CALL SCREEN, the current (calling) chain is suspended, and a next screen (or screen chain) is called in. The called screen can then return to the suspended chain with the statement LEAVE SCREEN TO SCREEN 0. Sometimes we might want to let an user call a popup screen from the main application screen to let them enter secondary information. After they have completed their entries, the users should be able to close the popup and return directly to the place where they left off in the main screen. Here comes CALL SCREEN into picture. This statement lets us insert such a sequence into the current one.

Read only

Former Member
0 Likes
1,072

call screen

You can insert a screen sequence. This adds another layer to a stack.

You insert a screen sequence using the CALL SCREEN <nnnn> statement.

Note: Layers created in this way must be removed afterwards. You can do this by setting the next screen

statically or dynamically to the initial value (0) an the end of the inserted screen sequence.

To interrupt processing of the current screen and branch to a new screen (or sequence of screens), use

the CALL SCREEN <nnnn> statement. The screen <nnnn> must belong to the same program.

In the program, the system constructs a stack. The stack has to be destroyed before the end of the

program.

set screen

For complex transactions it may be necessary to use multiple screens. The initial screen is determined

when creating the transaction code. Each screen determines the next screen according to the user input.

The next screen is entered statically in the screen attributes. At runtime you can temporarily override the

static next screen using the SET SCREEN <nnnn> statement.

You can establish a static sequence of screens by entering a value in the Next screen field of the screen

attributes.

If you enter 0 (or no value) as the next screen, the system resumes processing from the point at which

the screen was initiated, once it has finished processing the screen itself.

The SET SCREEN <nnnn> statement temporarily overwrites the Next screen attribute.

The screen <nnnn> must belong to the same program.

leave screen

To return to the statement following the CALL SCREEN statement, you can use either SET SCREEN 0.

LEAVE SCREEN. or LEAVE TO SCREEN 0. The screen that called the other screen is then processed

further.

leave to screen

To specify the next screen and leave the current screen in a single step, use the

LEAVE TO SCREEN <nnnn> statement.

reward if useful

set screen 0

leave screen and leave to screen 0 have the sdame effect.

Read only

Former Member
0 Likes
1,072

diff between set screen and call screen

syntax for set screen

set screen 300 /for ex

leave screen

call screen 300

the functionality of both is same but the syntaxes are diff

diff bet leave screen and leave to screen 0

syntax

set screen 0

leave screen

leave to screen 0

the functionality of both is same but the syntaxes are diff

hope this clarifies it further

do reward if helpful