2008 Sep 22 2:33 PM
Hello,
I have a problem with RFC Destionation "BACK".
I can not maintain view V_T462A to add new line with "BACK"-destination. I get here error "Destination BACK not active".
I have did test connection in SM59 and get error "Program no longer started via RFC. No return possible." (Others internal connections are working)
What things may cause of this error?
I use SAP Netweaver2004s - ERP2005.
Thanks for advance
Hello,
I have a problem with RFC Destionation "BACK".
I can not maintain view V_T462A to add new line with "BACK"-destination. I get here error "Destination BACK not active".
I have did test connection in SM59 and get error "Program no longer started via RFC. No return possible." (Others internal connections are working)
What things may cause of this error?
I use SAP Netweaver2004s - ERP2005.
Thanks for advance
2008 Sep 22 5:23 PM
Hi,
Have a look at oss note 187253, you need to maintain another RFC destination for the server as per this note.
Regards,
Darren
2008 Sep 23 6:56 AM
I do implementation of Baseline scenaries. Value "BACK" goes from scripts and BC Sets that belong to one scenario, so I can't use another destionation before as I implement whole scenario.
2009 Mar 25 8:14 PM
I have similar issues. Did you figure out what was going on?
I have 2 systems, one with 2 servers, the other with 3. Each system has 1 server on it from which the SM59 connection test for internal rfc = BACK fails. On the other server(s) in each system, the connection test succeeds.
Thoughts?
2009 Sep 01 2:00 PM
2009 Sep 16 8:48 AM
Hello,
the last line in this script is TCD(SM30. SM30_1). Set breakpoint at this line. Then, run again the activation. In debug mode you can change the variable. There are two of them with value BACK. Change it to appropriate from SM59 -> Internal Connections.
I hope it helps.
Regards
BJ
| User | Count |
|---|---|
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |