‎2007 Jul 23 7:51 AM
Hi All,
i had been assigned to a project dealing with PP
Please can anyone give the flow in PP
any materials are also invited
Regards
Kumar
‎2007 Jul 23 7:56 AM
<b>PP:</b>
The PP flow consists of planning and execution as described.
Here is the flow of PP in simple language:
First of all demand is generated for the product to be produced through demand management. It calculated the quantities to produce and the time for the final assembly.
The data from demand management is transferred to MRP.
The MRP checks for the availability of material at various stages of BOM. In case material is not available MRP generated planned order and Purchase requisition for production of components in house and procurement from vendor respectively.
Production in charge converts the planned order to production order and carries out the production activities once the order is released for production. Production is carried out as per the operation steps provided in the routing. Work centers are also mentioned with each operation in the routings where these operations are to be carried out.
Once the production is completed production confirmation is done and goods movement takes place.
Capacity planning is yet another part of PP which planes the capacities for various work centers. MPS is another tool which is used to plan out the master products. If MPS is to be run the inputs are provided from demand management to MPS. And the out put from MPS is then feed into MRP.
This is the overall flow for PP.
T-Codes:
MATERIAL
CREATE-GENERAL MM01 IMMEDIETELY
MM11 SCHEDULE
CHANGE MM02 IMMEDIETELY
MM12 SCHEDULE
MM13 ACTIVATE
FLAG FOR DELETION MM06 IMMEDIETELY
MM16 SCHEDULE
DISPLAY MM03 DISPLAY CURRENT
MM19 DISPLAY AT KEY DATE
DISPLAY CHANGES MM04 ACTIVE CHANGES
MM14 SCHEDULE CHANGES
MM17 MASS MAINTENANCE
MMAM CHANGE MATERIAL TYPE
OTHER MMBE STOCK OVERVIEW
MMPV CLOSE PERIOD
MMRV ALLOW POSTING TO
PREVIOUS PERIOD
MM50 INSTANT MATERIAL VIEW
MMSC ENTER STORAGE LOCATIONS
MM60 MATERIAL LIST
ARCHIVING(MATERIAL) MM71 ARCHIVE/DELETE
MM72 DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)
CS01 CREATE
CS02 CHANGE
CS03 DISPLAY
EXTRAS CS28 ARCHIVING
CS20 MASS CHANGES
EVALUATION/BOM CS11 BOM MULTILEVEL
EXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVEL
BOM CS13 SUMMURISED BOM
WORK CENTRES
CR01 CREATE
CR02 CHANGE
CR03 DISPLAY
CA85 REPLACE
CAPACITY CR11 CREATE
CR12 CHANGE
CR13 DISPLAY
HIERARCHY CR21 CREATE
CR22 CHANGE
CR23 DISPLAY
LINE HIERARCHY LDB1 CREATE
LDB2 CHANGE
LDB3 DISPLAY
REPORTING CR60 W/C INFORMATION SYSTEM
CR05 W/C LIST
CR06 COST CENTRE ASSIGNMENT
CR07 W/C CAPACITIES
CR08 W/C HIERARCHY
WHERE USED CA80 WORK CENTRE
CR15 CAPACITY
CR10 CHANGE DOCUMENTS
EXTRAS CR09 STD. TEXTS TASK LIST
CR41 ARCHIVING
ROUTING
STAD. ROUTING CA01 CREATE
CA02 CHANGE
CA03 DISPLAY
REF. OPERATION SETS CA11 CREATE
CA12 CHANGE
CA13 DISPLAY
RATE ROUTING CA21 CREATE
CA22 CHANGE
CA23 DISPLAY
REF. RATE ROUTING CA31 CREATE
CA32 CHANGE
CA33 DISPLAY
EXTRAS CA85 REPLACE W/C
MASS CHANGES CA95 REPLACE REF. OP. SET
CA75 REPLACE PRT
DELETE TASK LIST CA99 WITH ARCHIVING
CA98 W/O ARCHIVING
REPORTING CA80 WORK CENTRE
WHERE USED LIST CA90 REF. OP. SETS
CA70 PRODUCTION RESORCE TOOLS
COST CENTRE
OKKP MAINTAIN CONTROLLING AREA
KS01 CREATE COST CENTRE
KZS2 CREATE COSTING SHEET
KA01 CREATE PRI. COST ELEMENT
KA06 CREATE SEC. COST ELEMENT
KL01 CREATE ACTIVITY TYPE
KP26 ACTIVITY TYPE/PRICE PLANNING
Regards,
Pavan
‎2007 Jul 23 7:54 AM
Hi, Welcome to SDN
check the below links
http://www.easymarketplace.de/online-pdfs.php
http://help.sap.com/saphelp_47x200/helpdata/en/ba/df293581dc1f79e10000009b38f889/frameset.htm
http://www.sap-img.com/shop/sap-pp-production-shop-floor-control-configurations.htm
real time
Go through the below links,
http://help.sap.com/saphelp_47x200/helpdata/en/a0/20d634781a1b7ee10000009b38f83b/frameset.htm
user exits in PP
tables and tcodes
If u find it useful mark the points
Regards
Gopi
‎2007 Jul 23 7:55 AM
Hi,
Please check out the below websites .
Sometimes you can find a lot in the On line help:
http://help.sap.com/saphelp_47x200/helpdata/en/9c/df293581dc1f79e10000009b38f889/frameset.htm
If you go 1 or 2 levels deeper depending on your needs, you find mostly high level explanations of SAP submodules: example for Purchasing: http://help.sap.com/saphelp_47x200/helpdata/en/75/ee1fa755c811d189900000e8322d00/frameset.htm
For PP the link is: http://help.sap.com/saphelp_47x200/helpdata/en/ba/df293581dc1f79e10000009b38f889/frameset.htm
The same can be found in a downloadable (and printable) format (pdf) at http://help.sap.com/printdocu/core/Print46c/en/Data/htm/english.htm
Unfortunately this goes only until 4.6c. But the high level descriptions will still be valid.
http://mysapbi.blogspot.com/2007/01/sap-help-in-pdf-files.html
Refer this link as well
http://help.sap.com/saphelp_46c/helpdata/en/ba/df293581dc1f79e10000009b38f889/frameset.htm
Please check the following links -
http://mysapbi.blogspot.com/2006/12/production-planning-sap-pp.html
http://www.sapsuperusers.com/HomePage/SSUHomePage.html
http://www.easymarketplace.de/online-pdfs.php
Reward Points if it is Useful.
Thanks,
Manjunath MS
‎2007 Jul 23 7:55 AM
Look at <a href="http://help.sap.com/printdocu/core/Print46c/en/Data/Index_en.htm">PDF Index</a> or the version related to your system, look at PDF documents beginning with PP.
Capacity Evaluation (PP-CRP-ALY) data/pdf/PPCRPALY/PPCRP_ALY.pdf
Capacity Leveling (PP-CRP-LVL) data/pdf/PPCRPLVL/PPCRP_LVL.pdf
Capacity Leveling in PP-SOP and LO-LIS-PLN data/pdf/PPCRPSOP/PPCRP_SOP.pdf
Capacity Planning in Customer Service and Plant Maintenance data/pdf/PPCRPPMSM/PPCRP_PMSM.pdf
Capacity Planning in Long-term Planning data/pdf/PPCRPLTP/PPCRP_LTP.pdf
Capacity Planning in MPS and MRP data/pdf/PPCRPMRPMPS/PPCRP_MRPMPS.pdf
Capacity Planning in Process Industries data/pdf/PPCRPPPPI/PPCRP_PPPI.pdf
Capacity Planning in Repetitive Manufacturing data/pdf/PPCRPREM/PPCRP_REM.pdf
Capacity Planning in Sales and Distribution data/pdf/PPCRPSD/PPCRP_SD.pdf
Capacity Planning in Shop Floor Control (PP-SFC) data/pdf/PPCRPSFC/PPCRP_SFC.pdf
Capacity Planning in the Project System data/pdf/PPCRPPS/PPCRP_PS.pdfRegards
‎2007 Jul 23 7:56 AM
Hi,
Production planning
For example, consider a pump manufacturing plant, based on the customer requirement, planning is done for future months ( we plan for a qty on particular
date). Pump is an assembly - were main component would be manufactured in the plant and others would be procured. As PP, we are concerned only in the inhouse
manufacturing but the final assembly (considering BOM) can be done only if the procured components are available. MRP helps in planning the shortage, on
particular date based on the planned date. Work center (ex. lathe) place the components are machined/assembled (were the operation is done). Sequence of
operation is routing (lead time scheduling data is got from routing). In the MRP Run,basic or lead time scheduling (need to know when to start/finish date)
is done. On creation of the production order, system checks for which BOM and routing to be picked up (if there are many routings or BOM for that particular
finished product). Availabilty checks for material,PRT and capacity needs to be done. on release of the order, confirmation of the order can be done (on
completion of the order or after manufacturing the quantities). GI and GR have to be done.PP flow ends here
step 1: creation of master data (Material master,BOM,Work center,Routing)
step 2: Planning - can be done by Planned independent requirement (MD61), Independent requirement (MD81).
we plan for a quantity, on which date (it would be finish date).
step 3: MD04 -stock/requirement lsit (plan made can be viewed in MD04)
step 4: MRP run - MD02, PIR is converted into Planned order
step 5:Planned order to be converted production order - CO40, CO41
step 6: production order to be released - CA02
step 7: confirm the production order (order confirmation-CO15 (after which GI and GR is do
Go through the below links,
http://help.sap.com/saphelp_47x200/helpdata/en/a0/20d634781a1b7ee10000009b38f83b/frameset.htm
http://help.sap.com/saphelp_47x200/helpdata/en/ba/df293581dc1f79e10000009b38f889/frameset.htm
http://www.sap-img.com/shop/sap-pp-production-shop-floor-control-configurations.htm
<b>Reward points</b>
Regards
‎2007 Jul 23 7:56 AM
<b>PP:</b>
The PP flow consists of planning and execution as described.
Here is the flow of PP in simple language:
First of all demand is generated for the product to be produced through demand management. It calculated the quantities to produce and the time for the final assembly.
The data from demand management is transferred to MRP.
The MRP checks for the availability of material at various stages of BOM. In case material is not available MRP generated planned order and Purchase requisition for production of components in house and procurement from vendor respectively.
Production in charge converts the planned order to production order and carries out the production activities once the order is released for production. Production is carried out as per the operation steps provided in the routing. Work centers are also mentioned with each operation in the routings where these operations are to be carried out.
Once the production is completed production confirmation is done and goods movement takes place.
Capacity planning is yet another part of PP which planes the capacities for various work centers. MPS is another tool which is used to plan out the master products. If MPS is to be run the inputs are provided from demand management to MPS. And the out put from MPS is then feed into MRP.
This is the overall flow for PP.
T-Codes:
MATERIAL
CREATE-GENERAL MM01 IMMEDIETELY
MM11 SCHEDULE
CHANGE MM02 IMMEDIETELY
MM12 SCHEDULE
MM13 ACTIVATE
FLAG FOR DELETION MM06 IMMEDIETELY
MM16 SCHEDULE
DISPLAY MM03 DISPLAY CURRENT
MM19 DISPLAY AT KEY DATE
DISPLAY CHANGES MM04 ACTIVE CHANGES
MM14 SCHEDULE CHANGES
MM17 MASS MAINTENANCE
MMAM CHANGE MATERIAL TYPE
OTHER MMBE STOCK OVERVIEW
MMPV CLOSE PERIOD
MMRV ALLOW POSTING TO
PREVIOUS PERIOD
MM50 INSTANT MATERIAL VIEW
MMSC ENTER STORAGE LOCATIONS
MM60 MATERIAL LIST
ARCHIVING(MATERIAL) MM71 ARCHIVE/DELETE
MM72 DISPLAY ARCHIVE
BILL OF MATERIAL (MATERIAL BOM)
CS01 CREATE
CS02 CHANGE
CS03 DISPLAY
EXTRAS CS28 ARCHIVING
CS20 MASS CHANGES
EVALUATION/BOM CS11 BOM MULTILEVEL
EXPLOSION/MATERIAL CS12 STRUCTURE MULTILEVEL
BOM CS13 SUMMURISED BOM
WORK CENTRES
CR01 CREATE
CR02 CHANGE
CR03 DISPLAY
CA85 REPLACE
CAPACITY CR11 CREATE
CR12 CHANGE
CR13 DISPLAY
HIERARCHY CR21 CREATE
CR22 CHANGE
CR23 DISPLAY
LINE HIERARCHY LDB1 CREATE
LDB2 CHANGE
LDB3 DISPLAY
REPORTING CR60 W/C INFORMATION SYSTEM
CR05 W/C LIST
CR06 COST CENTRE ASSIGNMENT
CR07 W/C CAPACITIES
CR08 W/C HIERARCHY
WHERE USED CA80 WORK CENTRE
CR15 CAPACITY
CR10 CHANGE DOCUMENTS
EXTRAS CR09 STD. TEXTS TASK LIST
CR41 ARCHIVING
ROUTING
STAD. ROUTING CA01 CREATE
CA02 CHANGE
CA03 DISPLAY
REF. OPERATION SETS CA11 CREATE
CA12 CHANGE
CA13 DISPLAY
RATE ROUTING CA21 CREATE
CA22 CHANGE
CA23 DISPLAY
REF. RATE ROUTING CA31 CREATE
CA32 CHANGE
CA33 DISPLAY
EXTRAS CA85 REPLACE W/C
MASS CHANGES CA95 REPLACE REF. OP. SET
CA75 REPLACE PRT
DELETE TASK LIST CA99 WITH ARCHIVING
CA98 W/O ARCHIVING
REPORTING CA80 WORK CENTRE
WHERE USED LIST CA90 REF. OP. SETS
CA70 PRODUCTION RESORCE TOOLS
COST CENTRE
OKKP MAINTAIN CONTROLLING AREA
KS01 CREATE COST CENTRE
KZS2 CREATE COSTING SHEET
KA01 CREATE PRI. COST ELEMENT
KA06 CREATE SEC. COST ELEMENT
KL01 CREATE ACTIVITY TYPE
KP26 ACTIVITY TYPE/PRICE PLANNING
Regards,
Pavan
‎2007 Jul 23 7:59 AM
Hi,
<b>The Overall Flow For SAP PP:</b>
The PP flow consists of planning and execution as described.
Here is the flow of PP in simple language:
First of all demand is generated for the product to be produced through demand management. It calculated the quantities to produce and the time for the final assembly.
The data from demand management is transferred to MRP.
The MRP checks for the availability of material at various stages of BOM. In case material is not available MRP generated planned order and Purchase requisition for production of components in house and procurement from vendor respectively.
Production in charge converts the planned order to production order and carries out the production activities once the order is released for production. Production is carried out as per the operation steps provided in the routing. Work centers are also mentioned with each operation in the routings where these operations are to be carried out.
Once the production is completed production confirmation is done and goods movement takes place.
Capacity planning is yet another part of PP which planes the capacities for various work centers. MPS is another tool which is used to plan out the master products. If MPS is to be run the inputs are provided from demand management to MPS. And the out put from MPS is then feed into MRP.
This is the overall flow for PP.
Pls find link for Any helpful documents on PP:
http://www.sap-img.com/sap-pp.htm
Wish to receive reward points.
Regards,
Ameet
‎2007 Jul 23 8:15 AM
hi all
thanx for all your replies
Can u throw some light on FI module also
‎2007 Jul 23 8:18 AM
Basically there are 5 major topics/areas in FI,
1. GL Accounting -
related tables are SKA1, SKB1 Master data
BSIS and BSAS are the Transaction Data
2. Account Receivables- related to Customer
All the SD related data when transfered to FI these are created.
Related Tables BSID and BSAD
3. Account Payables - related Vendor
All the MM related documents data when transfered to FI these are created
Related Tables BSIK and BSAK
All the above six tables data is present in BKPF and BSEG tables
You can link these tables with the hlp of BELNR and GJAHR and with Dates also.
4. Special Purpose Ledger.. which is rarely used.
5. Asset Managment
In CO there are
Profit center Accounting
Cost center Accounting will be there.
Cross-Application Components -> Financial.
http://help.sap.com/saphelp_470/helpdata/en/e1/8e51341a06084de10000009b38f83b/frameset.htm
you will go through this link
http://www.sapgenie.com/sapfunc/fi.htm
Check this Link it out
http://www.sap-img.com/sap-download/sap-tables.zip
FI-CO
http://www.sapbrain.com/TUTORIALS/FUNCTIONAL/FI_tutorial.html
http://www.sapbrain.com/TUTORIALS/FUNCTIONAL/CO_tutorial.html
Regards
Gopi
‎2007 Jul 23 8:18 AM
Hi ,
check out this
Basically there are 5 major topics/areas in FI,
1. GL Accounting -
related tables are SKA1, SKB1 Master data
BSIS and BSAS are the Transaction Data
2. Account Receivables- related to Customer
All the SD related data when transfered to FI these are created.
Related Tables BSID and BSAD
3. Account Payables - related Vendor
All the MM related documents data when transfered to FI these are created
Related Tables BSIK and BSAK
All the above six tables data is present in BKPF and BSEG tables
You can link these tables with the hlp of BELNR and GJAHR and with Dates also.
4. Special Purpose Ledger.. which is rarely used.
5. Asset Managment
In CO there are
Profit center Accounting
Cost center Accounting will be there.
Cross-Application Components -> Financial.
http://help.sap.com/saphelp_470/helpdata/en/e1/8e51341a06084de10000009b38f83b/frameset.htm
you will go through this link
http://www.sapgenie.com/sapfunc/fi.htm
Check this Link it out
http://www.sap-img.com/sap-download/sap-tables.zip
FI-CO
http://www.sapbrain.com/TUTORIALS/FUNCTIONAL/FI_tutorial.html
http://www.sapbrain.com/TUTORIALS/FUNCTIONAL/CO_tutorial.html
Main Tables in 5 FI/CO :
5.1 FI :
5.1.1 Master data
SKA1 Accounts
BNKA Bank master record
5.1.2 Accounting documents // indices
BKPF Accounting documents
BSEG item level
BSID Accounting: Secondary index for customers
BSIK Accounting: Secondary index for vendors
BSIM Secondary Index, Documents for Material
BSIP Index for vendor validation of double documents
BSIS Accounting: Secondary index for G/L accounts
BSAD Accounting: Index for customers (cleared items)
BSAK Accounting: Index for vendors (cleared items)
BSAS Accounting: Index for G/L accounts (cleared items)
5.1.3 Payment run
REGUH Settlement data from payment program
REGUP Processed items from payment program
5.2 CO :
TKA01 Controlling areas
TKA02 Controlling area assignment
KEKO Product-costing header
KEPH Cost components for cost of goods manuf.
KALO Costing objects
KANZ Sales order items - costing objects
5.2.1 Cost center master data
CSKS Cost Center Master Data
CSKT Cost center texts
CRCO Assignment of Work Center to Cost Center
5.2.2 Cost center accounting
COSP CO Object: Cost Totals for External Postings
COEP CO Object: Line Items (by Period)
COBK CO Object: Document header
COST CO Object: Price Totals
Reward Points if it is Useful.
Thanks,
Manjunath MS