‎2006 Nov 24 3:06 PM
hi,
When a prg. is created and need to be transported to PD, dows selection texts always go with it? If not, then how do u make sure? Can u change the CTS entries? how do u do it?
‎2006 Nov 24 3:35 PM
Hello Surendra
Program texts do not have their own TADIR entry. Changes of program texts are transported as LIMU REPT objects in the transport request.
Thus, when creating a report the texts will always go along with the report. Successive changes (resulting in LIMU REPT objects for reports or LIMU FUGT for function groups) have to be transported to the production.
Regards
Uwe