PROJECT ARCHITECTURE..

Former Member
0 Likes
430

hi plz send general brief about ptoject architecture..

2 REPLIES 2
Read only

Former Member
0 Likes
387

Hi,

there are five stages

1) creating a model

2) implementation phase

3) creating variants

4) testing

5) Presenting with documentation.

<b><REMOVED BY MODERATOR></b>

Message was edited by:

Alvaro Tejada Galindo

Read only

Former Member
0 Likes
387

Hi

there are different types of SAP projects

basic structure will be

Project manager, Under him some functional consultants for each module one, and some technical consultants(developers) and one or 2 Basis consultants

and there will beone Project manager from client side whoc is incharge of SAP project and different head s for each module from client side

There are different types of Projects in SAP:

1. Implementation

Customer wants to install SAP/Include different modules of SAP viz. MM/SD/FI/CO/PP etc for the first time.Previously he might be using some legacy system in his orgn. This is implementation project. Here one needs to integrate several modules, migrate data from Legacy system to SAP system. Need to prepare interfaces/RFC's to interact with 3rd party systems.

Most of the company's follow ASAP methodology for the Implementation projects

there are 5 stages in the ASAP methodology

they are

1. Project Initial Preparation

2.Business Blueprint

3.Realization

4/ Final Preparation

5.Golive And Support

ABAP work mostly starts in the Blue print ending stage or in the realization stage

2. Support

Customer has already installed SAP & wants to give the work of maintaining those systems. This is support project

There is no phases in it. Just receive the tickets, solve and send back to client.

3. Upgrade

Customer has SAP Version 4.6b and wants to update his version i.e. wants to go to Version 4.7. This is upgrade project

4. Rollouts

Customer has upgraded his version & wants to rollout country specific changes.

This is rollout project

Say a COmpany is having branches in 3 to 4 countries.

In One country they have already implemented SAP

IF they wants to implement the same SAP in other countries of their branches they will simply follow the same SAP implementation policy (Rollout) how they have done for the first country just by changing the country specific settings and configurations.

Check the links,

https://forums.sdn.sap.com/click.jspa?searchID=3895726&messageID=3698776

https://forums.sdn.sap.com/click.jspa?searchID=3895726&messageID=2270483

Regards

Anji