Hi,
I am using BAPI_PO_CREATE1 to create PO's and populated header,headerx,item,itemx,schedule,schedulex.Net price is 0 in poitem & net price is X in poitemx.The bapi should automatically calculate the net price.But its throwing error "net price must be greater than 0".
When i tested BAPI_PO_CREATE with the same data,i'm able to create PO's. Can anyone suggest of any other structure or table has to be filled in BAPI_PO_CREATE1 to create a subcontracting PO.
Thanks,
Aparna Ganesh
Hi,
I am using BAPI_PO_CREATE1 to create PO's and populated header,headerx,item,itemx,schedule,schedulex.Net price is 0 in poitem & net price is X in poitemx.The bapi should automatically calculate the net price.But its throwing error "net price must be greater than 0".
When i tested BAPI_PO_CREATE with the same data,i'm able to create PO's. Can anyone suggest of any other structure or table has to be filled in BAPI_PO_CREATE1 to create a subcontracting PO.
Thanks,
Aparna Ganesh
2010 May 27 3:16 PM
In the bapi,when i fille net price,its creating PO's.But when i use bapi inside the program,we are passing 0 value so that it gets calculated internally inside BAPI.but its giving net price error.