2009 Feb 11 8:13 AM
Hello,
I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
- planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
- when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
Material requires configuration
Message no. 61259
Diagnosis
Orders and requirements for a configurable material must have characteristic values.
Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
System Response
MRP: Requirements without characteristic values for a material cannot be planned in MRP.
Procedure
Check requirements or orders.
Create a configuration evaluation for the material in the material master record if necessary.
Thanks in advance.
Hello,
I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
- planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
- when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
Material requires configuration
Message no. 61259
Diagnosis
Orders and requirements for a configurable material must have characteristic values.
Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
System Response
MRP: Requirements without characteristic values for a material cannot be planned in MRP.
Procedure
Check requirements or orders.
Create a configuration evaluation for the material in the material master record if necessary.
Thanks in advance.
2013 Jun 16 4:26 PM
Hi
I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
Thanks
Nagesh.