PM/PS Issue

Former Member
0 Likes
369

Could anybody advice with navigation steps for:

"When a user creates a PM Notification and chooses a graded leak the system uses the start date of the day entered. Then the system defaults a finish date based on the grade.

Example: Grade II leak start date 01/27/06 end date 10/24/06

If the Notification is being entered at a later date like today, but we were notified of the leak on Monday 01/23/06 we will do a date over ride on the start date field reflecting 01/23/06 instead of 01/27/06.

The end date doesn't change or recalculate to reflect the correct finish date at the end of the process unless it is done manually. This can become a compliance issue if the dates aren't correct."

Thanks in advance.

1 REPLY 1
Read only

suresh_datti
Active Contributor
0 Likes
331

Hi

To create a PM Notification, use Tcode IQS1 & select Notification type M1.

Regards,

Suresh Datti