2007 Sep 18 9:32 AM
Hi i am using the BAPI BAPI_MATERIAL_AVAILABILITY . this has been used in one Loop statement in my code and my loop wrorks for 30000 records it is taking lot of time to process what i need to get value from the BAPI is Committed quantity, is there any way to replace the BAPI and i get the Committed quantity directly from some table so that the performance of the code can be improved.
thanx
Hi,
Can you provide with some valid set of data for the combination of PLANT (WERKS), material no(MATNR) and Unit of measure (UNIT) so that I can test the same in IDES system and can provide you the direct database tables so you can run a select query along with some joins. That will really boast the performance of the system.
Thanks,
Samantak.
<b>Rewards points for useful answers.</b>
2007 Sep 18 3:06 PM
Hi,
Can you provide with some valid set of data for the combination of PLANT (WERKS), material no(MATNR) and Unit of measure (UNIT) so that I can test the same in IDES system and can provide you the direct database tables so you can run a select query along with some joins. That will really boast the performance of the system.
Thanks,
Samantak.
<b>Rewards points for useful answers.</b>
| User | Count |
|---|---|
| 6 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |