2021 Apr 29 11:16 AM
Hi
Is there any T-code which tells the linkage of finished product (FIN) with bulk product (NTM) in terms of Production Planning module except CS15.
BOM is not available for Finished product in the system and if want to know which Bulk material is mapped with this Finished product in that case is there any T-code available??
Hi
Is there any T-code which tells the linkage of finished product (FIN) with bulk product (NTM) in terms of Production Planning module except CS15.
BOM is not available for Finished product in the system and if want to know which Bulk material is mapped with this Finished product in that case is there any T-code available??
| User | Count |
|---|---|
| 4 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |