2011 Feb 02 1:59 PM
Hallo Experts,
If I have to replace an old meter with a new meter ,what shoulds be the system status of the new meter?
does it always have to be EFRE or even ELAG works.
I am trying to use the function module ISU_S_WORKLIST_INSTALL for meter replacement . I always get the error back
"The status of the meter does not allow to install the new meter' when i try to use a new meter with status ELAG.
Could some one tell me if the status really maters.
Thanks
Hallo Experts,
If I have to replace an old meter with a new meter ,what shoulds be the system status of the new meter?
does it always have to be EFRE or even ELAG works.
I am trying to use the function module ISU_S_WORKLIST_INSTALL for meter replacement . I always get the error back
"The status of the meter does not allow to install the new meter' when i try to use a new meter with status ELAG.
Could some one tell me if the status really maters.
Thanks
2011 Feb 02 2:10 PM
| User | Count |
|---|---|
| 4 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |