‎2008 Dec 22 5:24 AM
hi Friends,
i want to up load the PO using the BAPI.
Initially i went through the ME21N.
And i gave the following values.then i can able to create the PO.
the values are:
document typeIND Standard PO
Vendor : 1000 C.E.B. BERLIN
Org. : 1000 IDES Deutschland
Purch. Group : 001 Dietl,B.
Company Code : 1000 IDES AG
material : 100-100
PO Quantity :10
Plant :1100
now i wrote a BPAI program.
like this
data : poheader type bapimepoheader.
data : bapiret2 type table of bapiret2.
data : poitem type bapimepoitem .
data : it_poitem TYPE TABLE OF bapimepoitem.
DATA : SCHEDULE TYPE BAPIMEPOSCHEDULE,
IT_SCHEDULE TYPE TABLE OF BAPIMEPOSCHEDULE,
SCHEDULEX TYPE BAPIMEPOSCHEDULX,
IT_SCHEDULEX TYPE TABLE OF BAPIMEPOSCHEDULX.
DATA : BAPIMEPOHEADERX TYPE BAPIMEPOHEADERX.
DATA : WA_POITEMX TYPE bapimepoitemX.
DATA : POITEMX TYPE TABLE OF BAPIMEPOITEMX.
data : poheader type bapimepoheader.
DATA : BAPIMEPOHEADERX TYPE BAPIMEPOHEADERX.
data : poitem type bapimepoitem .
data : it_poitem TYPE TABLE OF bapimepoitem.
DATA : SCHEDULE TYPE BAPIMEPOSCHEDULE,
IT_SCHEDULE TYPE TABLE OF BAPIMEPOSCHEDULE,
SCHEDULEX TYPE BAPIMEPOSCHEDULX,
IT_SCHEDULEX TYPE TABLE OF BAPIMEPOSCHEDULX.
data : bapiret2 type table of bapiret2.
DATA : WA_POITEMX TYPE bapimepoitemX,
POITEMX TYPE TABLE OF BAPIMEPOITEMX.
data : out_ebeln type ebeln.
start-of-selection.
*HEADER DETAILS
poheader-comp_code = '1000'."wa_data-bukrs.
poheader-purch_org = '1000'."wa_data-ekorg.
poheader-pur_group = '001'."wa_data-bkgrp.
poheader-vendor = '1000'."wa_data-elifn.
poheader-doc_type = 'INB'."wa_data-esart.
poheader-ITEM_INTVL = '0001'.
BAPIMEPOHEADERX-comp_code = 'X'.
BAPIMEPOHEADERX-doc_type = 'X'.
BAPIMEPOHEADERX-pur_group = 'X'.
BAPIMEPOHEADERX-purch_org = 'X'.
BAPIMEPOHEADERX-vendor = 'X'.
*ITEM DETAILS
poitem-PO_ITEM = '00010'.
*MOVE '100-100' TO poitem-material.
poitem-material = '100-100'.
*poitem-material = wa_data-matnr.
poitem-plant = '1100'.
poitem-quantity = '10.00'."wa_data-bstmg.
DATE = SY-DATUM + 1.
poitem-ITEM_CAT = '0'.
poitem-ACCTASSCAT = ' '.
poitem-VEND_MAT = '100-100'.
append poitem to it_poitem.
WA_poitemx-PO_ITEM = '00010'.
WA_poitemx-MATERIAL = 'X'.
WA_poitemx-PLANT = 'X'.
WA_poitemx-QUANTITY = 'X'.
*WA_poitemx-ACCTASSCAT = 'K' .
*WA_poitemx-PO_ITEMx = 'X'.
APPEND WA_POITEMX TO poitemX.
**SCHEDULEX
SCHEDULEX-PO_ITEM = '10'.
SCHEDULEX-PO_ITEMX = 'X'.
APPEND SCHEDULEX TO IT_SCHEDULEX.
**SCHEDULE DATE
SCHEDULE-PO_ITEM = '10'.
SCHEDULE-DELIVERY_DATE = DATE.
APPEND SCHEDULE TO IT_SCHEDULE.
call function 'BAPI_PO_CREATE1'
exporting
poheader = poheader
POHEADERX = BAPIMEPOHEADERX
POADDRVENDOR =
TESTRUN =
MEMORY_UNCOMPLETE =
MEMORY_COMPLETE =
POEXPIMPHEADER =
POEXPIMPHEADERX =
VERSIONS =
NO_MESSAGING =
NO_MESSAGE_REQ =
NO_AUTHORITY =
NO_PRICE_FROM_PO =
importing
exppurchaseorder = out_ebeln
EXPHEADER =
EXPPOEXPIMPHEADER =
tables
return = bapiret2
poitem = it_poitem[]
POITEMX = POITEMX
POADDRDELIVERY =
POSCHEDULE = IT_SCHEDULE
POSCHEDULEX = IT_SCHEDULEX
POACCOUNT =
POACCOUNTPROFITSEGMENT =
POACCOUNTX =
POCONDHEADER =
POCONDHEADERX =
POCOND =
POCONDX =
POLIMITS =
POCONTRACTLIMITS =
POSERVICES =
POSRVACCESSVALUES =
POSERVICESTEXT =
EXTENSIONIN =
EXTENSIONOUT =
POEXPIMPITEM =
POEXPIMPITEMX =
POTEXTHEADER =
POTEXTITEM =
ALLVERSIONS =
POPARTNER =
POCOMPONENTS =
POCOMPONENTSX =
POSHIPPING =
POSHIPPINGX =
POSHIPPINGEXP =.
.
iam getting the following messages in BAPIRET2 Table:
1. No instance of object type PurchaseOrder has been created. External reference:
2. PO header data still faulty
3. No master record exists for vendor 1000
4. Vendor master data for vendor 1000 not found
can any one suggest me how to rectify the problem.
‎2008 Dec 22 10:28 AM
Hi
i am giving an example prog.....please refer if useful.......
report ztest_0001.
constants : c_x value 'X'.
data: del_date type sy-datum.
data: pohead type bapimepoheader.
data: poheadx type bapimepoheaderx.
data: exp_head type bapimepoheader.
data: return type table of bapiret2 with header line.
data: poitem type table of bapimepoitem with header line.
data: poitemx type table of bapimepoitemx with header line.
data: posched type table of bapimeposchedule with header line.
data: poschedx type table of bapimeposchedulx with header line.
data: ex_po_number type bapimepoheader-po_number.
parameters: p_matnr type ekpo-matnr.
parameters: p_werks type ekpo-werks.
parameters: p_lgort type ekpo-lgort.
parameters: p_menge type ekpo-menge.
parameters: p_lifnr type ekko-lifnr.
parameters: p_ekorg type ekko-ekorg.
parameters: p_ekgrp type ekko-ekgrp.
parameters: p_bukrs type ekko-bukrs.
Header Level Data
pohead-comp_code = p_bukrs.
pohead-doc_type = 'NB' .
pohead-creat_date = sy-datum .
pohead-vendor = p_lifnr.
pohead-purch_org = p_ekorg.
pohead-pur_group = p_ekgrp.
pohead-langu = sy-langu .
pohead-doc_date = sy-datum.
poheadx-comp_code = c_x.
poheadx-doc_type = c_x.
poheadx-creat_date = c_x.
poheadx-vendor = c_x.
poheadx-langu = c_x.
poheadx-purch_org = c_x.
poheadx-pur_group = c_x.
poheadx-doc_date = c_x.
Item Level Data
poitem-po_item = 1.
poitem-material = p_matnr.
poitem-plant = p_werks.
poitem-stge_loc = p_lgort.
poitem-quantity = p_menge.
append poitem.
poitemx-po_item = 1.
poitemx-po_itemx = c_x.
poitemx-material = c_x.
poitemx-plant = c_x .
poitemx-stge_loc = c_x .
poitemx-quantity = c_x .
poitemx-tax_code = c_x .
poitemx-item_cat = c_x .
poitemx-acctasscat = c_x .
append poitemx.
Schedule Line Level Data
posched-po_item = 1.
posched-sched_line = 1.
posched-del_datcat_ext = 'D'.
del_date = sy-datum + 1.
write del_date to posched-delivery_date.
posched-deliv_time = '000001'.
posched-quantity = p_menge.
append posched.
poschedx-po_item = 1.
poschedx-sched_line = 1.
poschedx-po_itemx = c_x.
poschedx-sched_linex = c_x.
poschedx-del_datcat_ext = c_x.
poschedx-delivery_date = c_x.
poschedx-quantity = c_x.
append poschedx.
call function 'BAPI_PO_CREATE1'
exporting
poheader = pohead
poheaderx = poheadx
testrun = ' '
importing
exppurchaseorder = ex_po_number
expheader = exp_head
tables
return = return
poitem = poitem
poitemx = poitemx
poschedule = posched
poschedulex = poschedx.
call function 'BAPI_TRANSACTION_COMMIT'
exporting
wait = 'X'.
if not ex_po_number is initial.
call function 'DEQUEUE_ALL'.
else.
call function 'DEQUEUE_ALL'.
message i020 . " " Process Done"
endif.
Regards
Adesh
‎2008 Dec 22 5:27 AM
‎2008 Dec 22 10:28 AM
Hi
i am giving an example prog.....please refer if useful.......
report ztest_0001.
constants : c_x value 'X'.
data: del_date type sy-datum.
data: pohead type bapimepoheader.
data: poheadx type bapimepoheaderx.
data: exp_head type bapimepoheader.
data: return type table of bapiret2 with header line.
data: poitem type table of bapimepoitem with header line.
data: poitemx type table of bapimepoitemx with header line.
data: posched type table of bapimeposchedule with header line.
data: poschedx type table of bapimeposchedulx with header line.
data: ex_po_number type bapimepoheader-po_number.
parameters: p_matnr type ekpo-matnr.
parameters: p_werks type ekpo-werks.
parameters: p_lgort type ekpo-lgort.
parameters: p_menge type ekpo-menge.
parameters: p_lifnr type ekko-lifnr.
parameters: p_ekorg type ekko-ekorg.
parameters: p_ekgrp type ekko-ekgrp.
parameters: p_bukrs type ekko-bukrs.
Header Level Data
pohead-comp_code = p_bukrs.
pohead-doc_type = 'NB' .
pohead-creat_date = sy-datum .
pohead-vendor = p_lifnr.
pohead-purch_org = p_ekorg.
pohead-pur_group = p_ekgrp.
pohead-langu = sy-langu .
pohead-doc_date = sy-datum.
poheadx-comp_code = c_x.
poheadx-doc_type = c_x.
poheadx-creat_date = c_x.
poheadx-vendor = c_x.
poheadx-langu = c_x.
poheadx-purch_org = c_x.
poheadx-pur_group = c_x.
poheadx-doc_date = c_x.
Item Level Data
poitem-po_item = 1.
poitem-material = p_matnr.
poitem-plant = p_werks.
poitem-stge_loc = p_lgort.
poitem-quantity = p_menge.
append poitem.
poitemx-po_item = 1.
poitemx-po_itemx = c_x.
poitemx-material = c_x.
poitemx-plant = c_x .
poitemx-stge_loc = c_x .
poitemx-quantity = c_x .
poitemx-tax_code = c_x .
poitemx-item_cat = c_x .
poitemx-acctasscat = c_x .
append poitemx.
Schedule Line Level Data
posched-po_item = 1.
posched-sched_line = 1.
posched-del_datcat_ext = 'D'.
del_date = sy-datum + 1.
write del_date to posched-delivery_date.
posched-deliv_time = '000001'.
posched-quantity = p_menge.
append posched.
poschedx-po_item = 1.
poschedx-sched_line = 1.
poschedx-po_itemx = c_x.
poschedx-sched_linex = c_x.
poschedx-del_datcat_ext = c_x.
poschedx-delivery_date = c_x.
poschedx-quantity = c_x.
append poschedx.
call function 'BAPI_PO_CREATE1'
exporting
poheader = pohead
poheaderx = poheadx
testrun = ' '
importing
exppurchaseorder = ex_po_number
expheader = exp_head
tables
return = return
poitem = poitem
poitemx = poitemx
poschedule = posched
poschedulex = poschedx.
call function 'BAPI_TRANSACTION_COMMIT'
exporting
wait = 'X'.
if not ex_po_number is initial.
call function 'DEQUEUE_ALL'.
else.
call function 'DEQUEUE_ALL'.
message i020 . " " Process Done"
endif.