‎2011 Jun 22 7:57 AM
Hi Experts,
The requirement is that at the time of creating routing through tcode CA01, the routing of the material will not be created if the material BOM does not exist. If there is not BOM for the material at the time of saving in tcode CA01, the system will throw an error. Is it possible? Can anyone suggest me the process?
Regards,
SURYA BASU
‎2011 Jun 22 12:52 PM