2011 Aug 16 12:32 PM
Hi!
We have 3 different ECC6 SAP systems, on physically separated computers: DEV, TST and PRD.
I would like to update some of the ZTABLE's content from the productive PRD system to the test TST system.
Is there a standard solution for this?
Thank you
Tamá
Hi!
We have 3 different ECC6 SAP systems, on physically separated computers: DEV, TST and PRD.
I would like to update some of the ZTABLE's content from the productive PRD system to the test TST system.
Is there a standard solution for this?
Thank you
Tamá
2011 Aug 16 1:06 PM
You could create a transport in PRD for the table entries and have that imported in DEV and TST, against the normal flow.
Thomas
2011 Aug 16 1:08 PM
Hi,
You can adjust table entries using SM30 like below way.
<copy/pasted passage removed by moderator>
Best Regards
Manoj
Moderator message: please do no copy/paste without listing the source!
http://help.sap.com/saphelp_sm32/helpdata/en/67/86b1ef415811d1893d0000e8323c4f/content.htm
Edited by: Thomas Zloch on Aug 16, 2011 2:20 PM
2011 Aug 16 3:02 PM
I normally use FM RFC_READ_TABLE for this. There are plenty of discussions in the forum about using it.
Rob
| User | Count |
|---|---|
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |