Application Development and Automation Discussions
Join the discussions or start your own on all things application development, including tools and APIs, programming models, and keeping your skills sharp.
cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

component allocation to operations using LSMW

Former Member
0 Likes
1,123

how to do component allocation to operations using LSMW. i dont have an oprtion other than using LSMW.

if some one did this please let me knom.

3 REPLIES 3
Read only

Former Member
0 Likes
713

hi,

For material assignment you will need to use structures RC271_DS and MAPL_DI_DS. I am using program RCPTRA02

My input structure looks like this. THere is two input files.

MATASSIGN Material Assignment File

GROUP C(008) Group

5 MATASSIGND Material Assignment Detail File

GROUP C(008) Group

GROUPCOUNTER C(002) Group Counter

PLANT C(004) Plant

MATERIAL C(018) Material

The mappings look like this.

5 RC271_DS Work center structure for direct input (for datasets)

5 Fields

TCODE Transaction code

Rule : Constant

Coding: RC271_DS-TCODE = 'CA02'.

STTAG Character field length = 10

Coding: DATA: TDATE(10).

CONCATENATE SY-DATUM4(2) '/' SY-DATUM6(2) '/' SY-DATUM(4) INTO

RC271_DS-STTAG = TDATE.

AENNR Change number

REVLV Revision level

WERKS Plant

PROFIDNETZ Profile

PLNNR Key for task list group

Source: MATASSIGN-GROUP (Group)

Rule : Transfer (MOVE)

Coding: RC271_DS-PLNNR = MATASSIGN-GROUP.

PLNAL Group counter

STATU Status

VAGRP Responsible planner group/department

VBELN Sales document

POSNR Character field of length 6

PSPNR Work Breakdown Structure Element (WBS Element)

5 MAPL_DI_DS Assign routing to material for direct input (for datasets)

5 Fields

ACTTYP Processing type for objects to be imported

Rule : Constant

Coding: MAPL_DI_DS-ACTTYP = 'H'.

MATNR Material number

Coding: MAPL_DI_DS-MATNR = MATASSIGND-MATERIAL.

WERKS Plant

Coding: MAPL_DI_DS-WERKS = MATASSIGND-PLANT.

PLNAL Group counter

Coding: MAPL_DI_DS-PLNAL = MATASSIGND-GROUPCOUNTER.

LIFNR Vendor's account number

KUNR Account number of customer

SUCHFELD Search Field for Customer-Specific Task List Selection

VBELN Sales document

Regards

Prashant

Read only

0 Likes
713

hey.

I did the material assignment step. what i asked for is the component allocation to operations.

Read only

Former Member
0 Likes
713

not answered