‎2009 Jan 09 5:04 PM
Hello i would like to know how to process a lsmw with a 2 leveled structure
I have a street structure from which is depending a PostalCode structure (transaction SR20)
looks like this
75116;;;;PARIS 16;75;75116;;75016
75116;;;;PARIS 16;75;75116;;75116
As 75116 is the key i can not create two streets.
I created a relationship between the 2levels in the source structure but can't map it in the change mapping screen.
What is the right way to do it ?
Thank you
Tom.
‎2009 Jan 12 9:56 AM
To be more precise :
In the Maintain Structure Relations step of the LSMW,
how can i add a relation inside a relation
-Relation1 Structure1 <<<< BPVENDORS Vendors
Select Target Structure Relation1. |
|-----Relation2 Structure2 <<<< ZLFA1 ZLFA1
Select Target Structure Relation2.