‎2007 Sep 06 5:00 PM
Hi Experts,
When does the ATP run triggered in creating of sales order?
I want to prevent the ATP to run during create sales order with order reference.
Thanks.
<b><REMOVED BY MODERATOR></b>
Message was edited by:
Alvaro Tejada Galindo
‎2007 Sep 06 5:15 PM
hi,
ATP is triggered for the open sales order(vbuklfstk = 'A' AND vbuklfgsk = 'A' )
<b><REMOVED BY MODERATOR></b>
Message was edited by:
Alvaro Tejada Galindo
‎2007 Sep 06 5:15 PM
hi,
ATP is triggered for the open sales order(vbuklfstk = 'A' AND vbuklfgsk = 'A' )
<b><REMOVED BY MODERATOR></b>
Message was edited by:
Alvaro Tejada Galindo
‎2007 Sep 06 5:17 PM
hi,
ATP means availability to promise i.e if the requested stock is not there to deliver
they promise to give it in the next time when ever stock is available.so we to consider for the material availability also to proceed further.
<b><REMOVED BY MODERATOR></b>
Message was edited by:
Alvaro Tejada Galindo