ASAP Methodology:
Project Preparation:
The first step in ASAP is Project Preparation. In this step the Functional Consultant will analyse the business process and define the system for SAP and will give the time line for the project. The Manpower required and the budgets are also considered in this step.
Blue Print Preparation:
This is second step in ASAP Methodology. In this step the Project Preparation scenarios are finalised. A out line of the Project is given in this step.
Realisation:
In this step actual development is taken place. The ABAPer is responsible for this step.
Testing:
In this step the development done by the abaper is being tested. This is the area where the Unit Test Document is prepared (i.e. Positive Testing and Negative Testing).
GO live and Support:
This is the final stage where the project is running in the live environment. In this step the bugs if any that are found in the go live procedure are fixed and the project will be considered as support project.
Rewards if useful.
‎2008 Jan 25 7:39 AM
ASAP Methodology:
Project Preparation:
The first step in ASAP is Project Preparation. In this step the Functional Consultant will analyse the business process and define the system for SAP and will give the time line for the project. The Manpower required and the budgets are also considered in this step.
Blue Print Preparation:
This is second step in ASAP Methodology. In this step the Project Preparation scenarios are finalised. A out line of the Project is given in this step.
Realisation:
In this step actual development is taken place. The ABAPer is responsible for this step.
Testing:
In this step the development done by the abaper is being tested. This is the area where the Unit Test Document is prepared (i.e. Positive Testing and Negative Testing).
GO live and Support:
This is the final stage where the project is running in the live environment. In this step the bugs if any that are found in the go live procedure are fixed and the project will be considered as support project.
Rewards if useful.
‎2008 Jan 25 7:42 AM
Find the detail info on blow link
[http://sapabapnotes.blogspot.com/2007/12/working-with-events-in-global-class.html|http://sapabapnotes.blogspot.com/2007/12/working-with-events-in-global-class.html]
reward points if its helpful
regards,
surya
‎2008 Jan 25 7:45 AM
‎2008 Jan 26 2:45 PM
hi,
1:-Project Preparation:
2:-Blue Print Preparation:
3:-Realisation:
4:- Final prepatation (Testing)
5:- GO live and Support:
Thanks.
Subash.