Hello PP Colleagues !
I have the next situation.
I create a new checking rule ZP with copy to rule PP standard. I unmark the indicator Incl.quality insp.stock and mark the indicador No stor.loc. inspectn, because I need the scope of the availability check at plant level.
The problem is when I check the availability in Process Order creation or release, all components are available but it is not thru the system consider the stock in quality inspection. For example this is the stock for one component :
If you can see the unrestricted use stock at plant leve is 56.040 and the reserved stock is 144.900, then why the system say all components are available ?
Somebody knows what happen ? Can you help me please ?
Regards
Vero
Hi Vero,
You need to adjust your scope of check settings in OVZ9 to define what is condiered / not considered in the availability check. You should see the relevant checking rule assigned to the order type in transaction OPJK.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In OVZ9 is the same information than OPJJ .
In OPJK I have been manteined the checks box for 'Check material avlbl. during order creation' and 'Check material avlbl. during order release' and there I assign the checking rule ZP .
Do you know why if Incl.quality insp.stock is unticked in availability check of the process order the system tell me all the components are available and in MRP the system show the material 98000482 with an inspection lot ?
Regards.
Vero
This is related to your accumulation settings in CO09.
If you look at the screenshot of CO09, you can sthat there is 574.940 available. You can see in the column on the right hand side ("C um ATP Qty"). This is the column that shows the available quantity.
The system is not using the required quantities to calculate the available quantity. It is using the confirmed quantities. Therefore, change the accumulation setting to "2" or "3" in OVZ2 and re-test the issue.
Dear Veronica,
Please check the foll:-
1. Checking group of the components --> Material Master
2. Checking rule in the process order type --> SPRO- Define Checking control
3. Whether any tick is maintained for including reservations, purchase orders etc. --> SPRO - Define scope of check
Also, please share the screen of the IMG activity Define Scope of Check if possible.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello !
I had customized all that you adviced me but the results are the same.
This is the IMG Define Scope of Check (OPJJ , PP-PI)
I mantain check box for 'Check material avlbl. during order creation' and 'Check material avlbl. during order release' and there I assign the checking rule ZP
The next is an other similar case :
During the availability check automatic or manual in process order the system tell me all components are availables but if I go to the MD04 this is the results :
Can you help me to understand this situation ?
Thanks a lot
Regards .
Vero
Hi Veronica,
Are the components in question manufactured in house?
As per the settings in OPJJ, all the planned orders and process orders of the components will be taken into account.
So even if you do not have unrestricted stock of a component, but there are planned / process orders available for that component, then the quantities of these orders would be considered.
The check rule are defined for production , so the apply for all components of the process order, some of them(semifinish goods) are produced in house and the others (ROH,LEER) are purchased. So the check rule include planned order and process order.
The component in question(98000482) is purchased .
This is the MRP view of material 98000482
As you can see there's no any planned order for this material for the requirement date. Then I understand that the quality inspection stock has been included.
Can you help me please ?
Vero
Hi,
Sorry to bug you in this earlier response. However, I donot see any issue here and the system behaviour is correct I believe. You have a stock which is higher than the Required Amount in Order and in the scope of check (from the screen shot I saw above), though you have marked all relevant fields except for Include Dependent Reservations. Make it X (All reservations) and you issue shall get resolved. Currently in your Order while performing availability check, the system is not looking into already existing order reservations and hence it is not giving you the Check result properly.
Hope this helps
Regards,
Bhaskar
Dear Veronica,
Mainly there are two types of checking....
1.For MRP the checking rule is to be maintained in T.Code OPPQ and then it is assigned to MRP3 view, remember this will come in picture at the time of MRP.
2.For SFC/Production order the checking rule will be linked to the plant+order type combination in T.Code OPJK.
So check your settings in OPJK t. code for your order type, check which checking rule you have assigned there.
I hope this will clear your doubt.
Best Regards,
Amit Kataria
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Pls. check
OPJJ - Stocks - maintain indicator for 'Incl.Quality Insp. stock' OR
OPJK (Order control) - Material availability
Maintain check box for 'Check material avlbl. when saving order ' and
Check rule - as 'PP'
Component check type - ATP or against PIR
Check Material tab on when you create production order(before releasing order )
You will get material shortage list if any .
Revert if it works.
Regards,
Milind
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In OPJJ if there is a tick maintained for "include reservations" then system will consider that also available.
Indicates whether, during an availability check, the system takes into account material reservation.
If you want the system to take material reservation into account, mark the field.
Try unchecking "include reservations" and create process order again and try.
Regards,
Alok Tiwari
Hi
Please check the Inward\Outward movement criteria as well.
Check if you have considered PR, PO.Also check if you have selected check without RLT or not.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
10 | |
5 | |
5 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.