Hi,

We are facing an issue while executing CK11N with multiple PVs. There are 2 PVs created for SFG material with procurement type "E" and valuation category"U" in accounting one tab(split valuation). I could see procurement alternatives have been maintained(CK91N) and mixed ratios(CK94 -  60% and 40%) are maintained for the material with 2 PVs  and valuation type.

We we execute CK11N, system is taking by default the first PV from material master with 100%. System is considering 2nd PV and mix ratios from CK94 even though it is not locked.

In ck11n, I expect to show the results like 1. Material level, 2, valuation type level, 3. PV1 level, 4. PV2 level.


can you please help me to solve this issue.


Regards,

Rao.

View Entire Topic
rajneesh_saxena
Active Contributor
0 Kudos

Hi

Create procurement alternative with valuation type and run cost estimate.

Rajneesh

navuluri_rao2
Participant
0 Kudos

Hi All,

Thank you for your reply.

I have not maintained quota arrangement for the material. I think it is not mandatory for this issue. I have maintained procurement alternatives with correct valuation type and still it is not considering 2nd PV during cost estimate.

Regards,

Rao.

navuluri_rao2
Participant
0 Kudos

Hi All,

Now I am able to do cost mate with mix ratio concept. Thanks for your help. I have not maintained quantity structure configuration settings with correct valuation variant.

Regards,

Rao.