cancel
Showing results for 
Search instead for 
Did you mean: 

Automatic alternative BOM selection

alex_alex85
Explorer
0 Kudos

Hi

I have a few levels BOM. Structure is following

alex_alex85_0-1710410090135.png

Requirement is: I need different way of BOM selection during creating Planned order:

1. If I use BOM1 for Material A, than on lower level BOM1 should be chosen for material B

2. If I use BOM2 for Material A, than on lower level BOM2 should be chosen for material B

Is it possible to setup it with this direct connection.

Other methods like Selection method, Lot-size procedure does not work. Because both options are used for completely the same conditions.

Thanks

 

View Entire Topic
DerekDing
Product and Topic Expert
Product and Topic Expert
0 Kudos

Firstly, when running the MRP, the BOM selected will be defined in Plant parameters.

SPRO->Production->Plant Parameters->Carry out overall Maintenance of Plant Parameters.

The system will choose the 01 BOM as default.

And if you create two production version for B (0001 use BOM 01 and 0002 use BOM 02), and the system will choose the 0001 as default, you should change the production version manually.

Another solution:

According to your requirement, you can consider to using new material numbers, for example A1 B1, since the components updated, you can consider the Header Material was change as well.