on 06-02-2015 1:17 AM
Will it be possible to create a production order and material consumption at two different WM storage locations (one WM storage location is default, other WM storage location is manual assigned)? If yes, then how can we handle this process? Thanks in advance.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.