on 10-09-2007 7:31 AM
Hi!
All,
While Creating the Delivery (VL01n) with reference to Sales Order i have a error. Even i maintained Material correctly.
'Storage location was deleted since material is not maintained correctly'.
Plz give me suggestions, how to solve?
Thanks and Ragards.
raju.
Hi raju,
for this problem first u extend the material to that perticular storage location by using trasnaction <b>MM01</b> .
then goto <b>vl01n</b> then enter that perticular storagelocation then do <b>pgi</b>.then i think ur problem will solve.
reward points if it helps.
thanks®ards
veera
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raju
Goto <b>MMSC</b> and check whether the required storage location for the material is maintained there. If not, you should maintain.
Thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
you need to maintain your material master data for storage location and make sure that you have a confirmed qty. for the delivery date in your sales order. You can only choose item lines of a sales order for create a delivery when you have a confirmed quantity per the selection date.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
106 | |
12 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.