Hi,
My client requirement is that they have two chemicals say AXXXX and BXXXX which are taken from different suppliers in different percentage.
for ex: AXXXX from supplier1 with 30%,supplier 2 - 50%,supplier3- 40%,supplier4-35%,supplier5-60%
BXXXX from supplierx with 70%,supplier y -45%,supplier z-50% and so on.
These two chemicals are in a BOM which are consumed against the production order.
These two chemicals are part of a BOM.In production these two chemicals are consumed with 100% concentration .
But the percentage may vary for ex AXXXX if 70%,BXXXX will be 30% and if AXXXX is 50% and BXXXX is 50%.
How to do this if the percentages vary?
Can you experts please let me know how to resolve this ?
Regards,
Kapil Dev
Hi Kapil,
Are you using PP or PP-PI?
If yes, You can use material quantity calculation for Component B for example 100 - Qty of Component A.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Tell me one thing can I use PP for some materials and PPPI for this particular scenario.It means I need to define extra masters like recipes and resources and what will be the change in customization(SPRO).I think I need to do all the settings in PPPI in SPRO for this ordertype and other master data
Re,
Kapil
Hi Kapil,
Yes you can reference your calculation to other materials quantity & batch characteristric is not mandatory.
For example Material A Req qty 50 KG & Material B Req qty = 100 KG - Material A.
In this case if you change qty of material A then the quantity of Material B will be changed by system.
Regards,
Navin