Hi all,I have been trying to create a custom plugin that will allow your users to filter the worklist within an Operation Activity Pod by the sales order (Customer Order) number column.I have created a custom plugin that consists of the operationPodS...
Hi,
From reading online and comparing my 15.4 version of SAP ME it looks like the OEE Report activity was removed, is there an alternative method to generate reports for OEE without going through the OEE pod?
As a carry on from the above we are a...
We have created a HTML page within the workbench that we want to use a on display screen to show production information. This would be shown on a screen with no keyboard/mouse connected and the data continually refreshes every minute (not the webpage...
We seem to be having hit and miss results with getting our PCO installations connected to our MII server. We have a successfully connected a couple of Windows 10 machines using version 15.5.0.8 of PCo however some just fail to generate the WDSL link ...
Do you actually need the start and end time? if you purely need the duration of the activity for costings then this can be achieved with the activity confirmation postings plugin
Hi Wonpyo,We had similar scenario, for example the order is damaged after being produced and order completed in SAP DM, for example in the loading area as it is about to be loaded onto a trailer.For this we handled with a manual process which involve...
Hi @Wonpyo ,Apologies I didn't see that you responded.Sure, here are the two examples of the PPD we created for doing confirmations, note the "postedBy" user needs to be a valid DM user that is assigned to the WorkCentre within DM otherwise you will ...
Morning WonpyoDepending how you want to do it these are the ways we have achieved it though it is dependant on requirement.You can put this line in the confirmation integration XLST.<IV_PROPOSE_ACTIVITIES>X</IV_PROPOSE_ACTIVITIES>We had some issues w...