SM62 Event status change time log

0 Kudos

In SM62, is there a way to find the time by which the status was changed from NEW to CONFIRMED?

SM62 shows the Event creation time, but not the status change time.

The background is that we have an external job scheduling system that listens to SM62 event. Sometimes that system is delaying to listen. So if we have a log of status change of these events it would help in troubleshooting.

Accepted Solutions (0)

Answers (1)

Answers (1)

tom_wan
Contributor
0 Kudos

Hisankaralingam.maharajan

If you want to trace the calls of function BAPI_XBP_BTC_EVTHIST_CONFIRM, you can do this by running report SXBP_SET_TRACE (note ##1926448)

call report SXBP_SET_TRACE, check function BAPI_XBP_BTC_EVTHIST_CONFIRM and click on 'My function'. After that, calls to function BAPI_XBP_BTC_EVTHIST_CONFIRM will be logged in transaction RZ15.