on 07-09-2008 4:29 AM
What are prerequisites has to be done before going to ir
thanks
HI parvath
High Level Process Flow : I assume you already know the components and terminologies before we proceed into this section. In a nutshell the end to end process flow of SAP XI is depicted over here:
1. Create products, software component versions, technical systems, business systems in the System Landscape Directory (SLD).
2. Import the software component version into the Integration Repository (IR) from the SLD and start developing the source/target messages, source/target message interfaces and mapping between source and target systems.
3. Import the business systems into the Integration Directory (ID) and start configuring the sender/receiver communication channels, agreements, receiver and interface determination that binds the interfaces and the routing.
your SAP Basis you need to do some configuration and system readiness check before the starting the developments of SAP XI. Configurations are usually done by SAP basis but these links might be handy to understand weird errors that occur commonly in SAP XI.
In IR (Integration Repository)
Import Software components that we have created in SLD
Create Namespaces
Under Interface Objects Create Data type, Message Type, Message Interface for Receiver
Tip: we donu2019t need any Data Type, Message Type and Message Interface for Sender because we will be sending IDoc from Sender R/3 System so, we will Import the IDoc from Sender system and this will be used for Source Data Type, Message Type and Message Interface.
Under Mapping Objects create Massage Mapping and Interface Mapping for the scenario
Activate all objects created in IR
regards
kummari
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
73 | |
9 | |
8 | |
7 | |
6 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.