Hi,
We have a requirement to get the data at lower level for KF1...whereas the KF1 has data at higher level.
So, how can i have the data at lower level without creating new KF.
I tried adding the calculation to the existing KF1, but got the error message.
| "The planning level for the output key figure and the planning level for the input key figure must match in the calculation definition". |
PS: KF1 is stored and not editable.
Please suggest
Thanks,
NC
Request clarification before answering.
Hi,
Refer the split factor calculation in the model configuration guide.
http://help.sap.com/download/ibp/ibp40_model_ref_en.pdf
Section 18.8
Thanks,
Raghav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 12 | |
| 7 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.