cancel
Showing results for 
Search instead for 
Did you mean: 

Can the 'Recurs. Allowed' indicator be set at a plant level?

Former Member
0 Kudos

While trying to run CS12 (multilevel BOM explosion) for production BOMs I noticed that for a certain plant the explosion never went beyond the first level. I've traced that issue back to the fact that all components of production BOMs at this plant have the 'Recurs. allowed' flag set, which prevents CS12 from performing the multilevel inspection. None of the BOMs I have looked at are actually recursive, and I know no users are setting this flag, so it makes me wonder if there is some sort of configuration that can be done at the plant level which would automatically set this flag for BOMs in that plant.

Accepted Solutions (0)

Answers (0)