Hi guys

I have a requirement in project that to send actual cost generated in maintenance order in S4 hana system to ECC system ..How I can do that I have tried through idoc iorder but there is no cost component available in the segment .

Accepted Solutions (0)

Answers (2)

Answers (2)

Paulo_Vitoriano
Active Contributor

Hi Pradeep,

Not sure about your particular scenario/requirement, but as a general rule you need to segregate between the master data (PM order) and the transactional data (Accounting posting), so there will be two separate flows between two systems. You can always add additional segments to the Z version of the standard IDOC, but I do not really see it as a solution to bundle master data with cost information.

Regards,

Paulo

pradeep2808
Explorer
0 Kudos

Thanks for the answer Paulo, let me check on this

peter_atkin
Active Contributor
0 Kudos

One of my customers is using CFIN to do this.

Talk to you Finance Team who should be able to help