we are having a problem with a specific material , when adding an extra line for an already existing component in a process order for this extra line the storage location and material staging indicator are not being filled. While the original line for this material does have this line.
We create a process order with a PV, we use control cycles and issueing storage location in the bom is filled. We only have this issue with one material. What could be wrong ?
I checked all obvious masterdata elements.
sorry i made typing error
we are having a problem with a specific material , when adding an extra line for an already existing component in a process order for this extra line the storage location and material staging indicator are not being filled. While the original line for this material does have this information filled correctly.
We create a process order with a PV, we use control cycles and issueing storage location in the bom is filled. We only have this issue with one material. What could be wrong ?
I checked all obvious masterdata elements.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
9 | |
9 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.